BUILDING AND CONSTRUCTION INDUSTRY

 

Project - Detailed Planning of the territiry of the district "Kroshens’kyi" in Zhytomyr
Initiator -
 Main board of building and architecture of Zhytomyr Regional State Administration
Total cost of proposal (project) -  
375 million USD
Investments required - 375 million USD
Predicted p
ayback period –
The essence of investment proposal
(project) – The project defined placement of two residential areas in southern and northern areas of limited main and residential streets with a full range of institutions and businesses servicing the local value.

Source of proposal (project)  - land plot – 57,6 hectares
Proposal
(project) readiness stage -
Contact information -
10014, Zhytomyr, square named after S.P. Korolyova, 12, Deputy head of the main board – V. Medyns’kyi, phone: (0412) 42-09-35, e-mail:  HYPERLINK "mailto:[email protected]" [email protected]

 

_____________________________________________________________________________

Project - Construction of concrete blocks in the village Stryzhivka

Initiator - LLC "BUDKLASTER"

Total cost of proposal (project) - 36.7 million. USD

Investments required - 36.7 million USD

Predicted payback period - 4.5 years

The essence of investment offer (project) - construction of concrete blocks vyrobnchoyu capacity of 360,000 cu.m / year of aerated concrete and 30,000 tons / year - mineral wool insulation (basalt)

Source of supply (project) - 15.7 hectares land plot is located 1.4 km from Kyiv-Chop, is an adjacent dead-end railway line Zhytomyr-Korostyshiv; gas brought to the border land, acquired by TP - 35 / 6 with capacity of 6400 kVA; water supply is from two artboreholes and water intake from the reservoir.

Proposal (project) readiness stage - made project estimates, carried out a comprehensive examination, received a permit inspection of the State Architectural and construction, developed technical specifications for construction under "yizdnoyi roads in the plant.

Contact information – Korostyshiv, Proletarska str., 2

S. Spasibo mob. phone 067 2302510, phone/fax (044) 502 50 65

e-mail: [email protected] and  HYPERLINK "mailto:[email protected]" [email protected]

 

___________________________________________________________________________

Project – A brick factory building in Markushivs’ka village council

Initiator – Berdychivs’ka district state administration

Total cost of proposal (project) – 25 million USD

Investments required – 25 million USD

Predicted payback period – 5 years

The essence of investment proposal (project) – Construction of brick factory, the main products of which will be brick stamps 125.

Source of proposal (project) – availability of raw materials (loam deposit with a volume of mineral reserves 352.9 thousand cubic meters), in the village there are 35/10 kV transformer substation and gas distribution station

Proposal (project) readiness stage – project proposal

Contact information – Berdychiv, Cathedral Square, 23,

Deputy Head of RegionalState Administration M. Klimchuk

phone: (04143) 4-26-02, fax: (04143) 2-00-40

 

_____________________________________________________________________________

Project - Building a factory for production of ceramic bricks in Terehivs’ka village council

Initiator – Berdychivs’ka regional state administration

Total cost of proposal (project) - 20-50 million. USD

Investments required - 20-50 million. USD

Predicted payback period - 8 years

The essence of investment proposal (project) - Building of a factory for production of ceramic bricks with volumes 20 million units per year.

Source of proposal (project) - availability of raw materials (loam field area of 50 ha).

Proposal (project) readiness stage - project proposal

Contact information – Berdychiv, Cathedral Square, 23

Deputy Head of RegionalState Administration M. Klymchuk

phone (04143) 4-26-02, fax (04143) 2-00-40

 

________________________________________________________________________________

Project – Housing on the street. Chekhov

Initiator – Executive Committee of Berdychiv City Council

Total cost of proposal (project) – 13,5 million. USD

Investments required – 13,5 million. USD

Predicted payback period -

The essence of investment proposal (project) – land area of 1,6 hectares with existing communications for residential development.

Source of proposal (project) – land area of 1,6 hectares with existing communications.

Proposal (project) readiness stage – project proposal

Contact information – 13300, Berdychiv, Zhovtneva square, 1,

Deputy Mayor T. Pavlishyna

phone (04143) 2-01-63, fax 2-70-79,

E-mail:  HYPERLINK "mailto:[email protected]" [email protected]

 

 

Project - Construction of ceramic bricks in the village Ivanivka

Initiator - Ivanvka Village Council

Total cost of proposal (project) – 6,7 million. USD

Investments required – 6,7 million. USD

Predicted payback period – 6 years

The essence of investment proposal (project) - construction materials

Source of the proposal (project) - availability of 3 hectares land plot, which is located southern village Ivanivka along with the existing clay quarry at 1 km from the highway Kyiv-Chop and 4 km from Zhytomyr

Proposal (project) readiness stage - Feasibility Study

Contact information – 12445, Zhytomyr region, village Ivanivka, B. Zakharchuk

phone: (0412) 49-11-33, mob. phone: 097-526-03-89

 

Project – Construction of residential building with a built-attached rooms on the str. Shevchenko, 7a

Initiator – The Executive Committee Novohrad-Volyns’kyi city council

Total cost of proposal (project) – 5.3 million. USA

Investments required – 5.3 million. USA

Predicted payback period -

The essence of investment offer (project) – Construction of residential building with built-in attached to premises on the street. Shevchenko, 7a.

Source of supply (project) – area of land for construction - 0.17 ha site area - 1188 sq.m, total area of the object - 6200 sq.m. Floors - 8-9. Conditions of building: the purchase and demolition of 3 residential buildings, diversion of land with communal ownership, partial transfer of utilities.

Project readiness stage (project proposal, feasibility study, business plan, project estimates) - project proposal

Contact information - 11700, Novohrad-Volyns’kyi st. Shevchenko, 16, S. Karpins’kaya - Head of Economics of the executive committee of the City Council

phone (04141) 5-33-96, e-mail: [email protected]

 

 

Project - Development of colorful clay deposits and the construction of brick plant

Initiator – Zorokivs’ka Village Council

Total cost of proposal (project) - 3 million. USD

Investments required - 3 million. USD

Predicted payback period - 3 years

The essence of investment proposal (project) - field development and construction of colorful clay brick plant.

Source of proposal (project) - deposit of clay placed on reserve lands Zorokivs’ka village council. Exploration conducted on the territory of 5 ha.

Proposal (project) readiness stage - the investment offer

Contact information – Cherniakhivs’kiy district, village Zorokiv, the village head G. Lysyuk phone: (04134) 9-44-42

 

 

Project - Building social and affordable housing on the street. Nyzhiretska 40a
Initiator -
Executive Berdychiv City Council
Total cost of proposal (project), thousand USD -
$ 2,5 million USD
Investments required -
$ 2,5 million USD
Predicted payback period (years) -

The essence of investment proposal (project) – Construction of social and affordable housing
Source of proposal (project)
 – land area of 0,22 hectares of existing communications
Proposal (project) readiness stage -
project proposal
Contact information –
13300, Berdychiv, Zhovtneva square, 1,

deputy  mayor T. Pavlishyna, phone (04143) 2-01-63, fax 2-70-79,

e-mail:  HYPERLINK "mailto:[email protected]" [email protected]

 

 

Project – The completion of the 44-apartment house construction 

Initiator – Chervonoarmiys’ka district state administration

Total cost of proposal (project) – 2 thousand USD

Investments required – 244 thousand USD

Predicted payback period – 1 year

The essence of investment proposal (project) – Construction of 44 residential apartments.

Source of proposal (project) - land plot – 0,4 hectares, the availability of water, gas, electricity supply.

Proposal (project) readiness stage - project and budget documentation

Contact information - uv. Chervonoarmiys’k, Lenina str., 123, first deputy chairman of RSA  V. Saponyuk, phone (04131) 32-287

 

 

Project – Construction of an object commercial, residential, social and cultural significance on the Sverdlov street , 66A
Initiator - Executive committee of Berdychiv City Council
Total cost of proposal (project) –
1,7 million USD
Investments required – 1,7 million USD
Predicted payback period -
The essence of investment proposal (project) -
construction of commercial, residential, social and cultural significance
Source of proposal (project) -
land plot with area of 0,6 ha, with available communications.
Proposal (project) readiness stage - project proposal
Contact information -
13300, Berdychiv, Zhovtneva 1, Deputy Mayor T. Pavlishyna ph. (04143) 02.01.63, fax 2-70-79, E-mail: [email protected]

__________________________________________________________________

 

Project - Completion of 25 apartment house on the street. Irshansk street, 9 in the New Borova
Initiator - Volodarsk-Volyns’ka State Administration
Total cost of proposal (project), th
ousand USD - 1.5 million USA
Investments required -
1.5 million USA
Predicted payback period (years) -
The essence of investment offer (project) -
construction of affordable housing
Source of supply (project) - distance to highway Saint Petersburg - Ismail - 3 km to the railroad tracks St. Petersburg - Odessa - 1 km.
Project readiness stage (project proposal, feasibility study, business plan, project estimates) - project proposal
Contact information -12101, Volodarsk-Volyn, Karl Marx st., 6, head of architecture and urban RSA G Samoilenko  tel. (04145) 3-15-91

_____________________________________________________________________________

                                    

Project - Restoration of the brick factory
Initiator – Ruzhins’ka regional state administration, SPE "Bilotserkivpryvatbud"
Total cost of proposal (project) -
450 thousand USD (estimated selling price of the company)
Investments required -
Predicted payback period -
3 years
The essence of investment proposal (project) -
Recovery of brick plant, brick manufacturing output of 3 million units per year, creating 36 new jobs.
Source of proposal (project) -
area of the land plot – 5,84 hectares, the area production space - 9140 square meters (new equipment was repaired furnace, crane beams, carpentry shop, Sawmill, concrete plant, weight, shop, artesian wells, gas concrete line 200 cubic meters per month). Career area – 5,7 hectares (available opportunity for further expansion). Balance reserves of minerals: A – 154 thousand cubic meters., B – 117 thousand cubic meters. Utilities: electricity, water tower, the area paved, fenced, partially lit.
Project readiness stage (project proposal, feasibility study, business plan, project estimates) - final sale of the enterprise
Contact information – Ruzhins’kyi district, Ruzhyn. Lenin str., 70, head of the enterprise V. Belets’kyi phone 067 500-62-18 

 

 

Project - Restoration of the brick factory word in the village Krylivka
Initiator –
Ruzhins’ka regional state administration, SE "Ruzhins’kyi tsehel’nyi zavod"
Total cost of proposal (project), thousand USD –
200 thousand USD
Investments required - 100 thousand USD
Predicted payback period (years) -
3 years
The essence of investment proposal (project) -
restoration of a brick factory in the village Krylivka, production of bricks, creating new jobs
Source of proposal (project) - production facilities – 1,000 square meters, square brick factory – 1,4 hectares, the area of the clay quarry – 1,4 hectares. Communications: brought to the plant of gas supply, distance to source of electricity – 600 m.
Proposal (project) readiness stage -
project proposal
Contact information –
Ruzhins’kyi district village Krylivka, Naberezhna str., 6, head of enterprise U. Menshykov phone +38 067 323 06 90

     

            

Project – Restoration of the factory for production of building bricks
Initiator – DMS LLC “Tsegel'nyk”
Total cost of proposal (project) – 115 thousand USD
Investments required – 115 thousand USD
Predicted payback period – 5 years
The essence of investment proposal (project) – modernization of enterprises, establishment ofmodern technological equipment for the production of brick construction.
Source of proposal (project) – 6 hectares land plot, power supply – 1200 kW, the roads paved, 11 km to the railway station Pechanivka, gasification facility.
Proposal (project) readiness stage – project proposal
Contact information – Lyubars’kyi district, Stara Chortoriya str. Tsegel’na str., director Serhiy Shelest, phone: +38 097-264-94-94

 

 

Project - The production of ceramic bricks

Initiator - PDP "Agrofirma “Ranok"
Total cost of proposal (project)
60 thousand USD
Investments required -
60 thousand USD
Predicted payback period – 1,5 year
The essence of investment proposal
(project) – modernization of production, restoration of brick ceramic grade according to Ukrainian state standart (GOST) 830-80 75-125 'Brick, stone and ceramic"
Source of proposal
(project) – land, forging department, five Schoch, ring stove, administrative buildings, energy, personnel, distance to the regional center – 80 km, railway station – 22 km., district center – 35 km
Proposal
(project) readiness stage - feasibility study

Contact information – 11265, p.. Hannopil’, Emilchins’kyi district

Zhytomyr region, Chairman V. Shpychkivs'kyi

phone 04149 61-4-65, mob. phone 096-2135796

_________________________________________________________________________

 

Project - Construction of multi-storeyed apartment houses on the Tymoshenko str., 2
Initiator - The Executive Committee of Novograd-Volyns’kyi city council
Total cost of proposal (project), thousand USD -
Investments required -
Predicted payback period (years) -
The essence of investment proposal (project) –
Construction of apartment houses on the Tymoshenko str., 2. Superficiality – 5,9 floors.
Source of proposal (project) - area of land – 0,7 hectares, is located in the southwestern part of the town. The area is all communications. It is necessary to demolish one-story building.
Proposal (project) readiness stage – project proposal.
Contact information – 11700, Novograd-Volyns’kyi Shevchenko str., 16,
Karpins’ka S. Head of Economics of the executive committee of the city council 

phone (04141) 5-33-96, e-mail:  HYPERLINK "mailto:[email protected]" [email protected]

 

 

Project – Construction of apartment houses in the neighborhood " Mors’ke "
Initiator – Executive committee of Novograd-Volyns’kyi city council
Total cost of proposal (project) -
Investments required -
Predicted payback period -
The essence of investment proposal (project) – Construction of apartment houses in the neighborhood residential development "Mors’ke"
Source of proposal (project) – area of land – 5,4085 hectares. Superficiality – 9 floors. The plot is located in the downtown. 
Project readiness stage – project proposal
Contact information – 11700, Novograd-Volyns’kyi Shevchenko st., 16, Karpins’ka S. Head of economy department of the executive committee of the city council phone: (04141) 5-33-96, e-mail:  HYPERLINK "mailto:[email protected]" [email protected]

_____________________________________________________________________________

 

Project - Building of a factory for the production of bricks
Initiator – Kychkуrivs’ka village council
Total cost of proposal (project) - to the investor’s consideration
Investments required -
100%
Predicted p
ayback period - depending on the project cost
The essence of investment proposal (project) – acompany producing bricks.

Source of proposal (project) – deposit of loam with a stock 527 thousand cubic meters.
Proposal
(project) readiness stage -  project proposal.

Contact information – Contact information -  Radomyshl’s’kyi district village Kychkyri, the village head O. Maksymenko, phone: (04132) 7-84-24, 7-84-21.

 

 

Project  - Renewal of porcelain tableware on LLC "Baranivs’kyi farforovyi zavod"
Initiator – Baranivs’ka regional state administration, co-owner of LLC "Baranivs’kyi farforovyi zavod"
Total cost of proposal (project) – 1 million USD
Investments required -
1 million USD
Predicted payback period – 6 months
The essence of investment proposal (project) –
Restoration of the production of porcelain tableware at the "Baranivs’kyi farforovyi zavod"

Source of proposal (project) - The company reconstructed its production process. There was installed an upgraded German tunnel oven Heimsoth, with optimum fallen temperature 1420 ° C, isostatic presses DORST and SAMA, casting machine. Entered into action force complex of modern equipment for quick prototyping. Organized its own production at times. To restore the production additional funds are needed. On the production may be involved up to 800 employees. Enterprise runs on natural gas, is connected to a power supply, water supply and drainage system has adequate communication and transport links, situated in the center of Baranivka, area of land where the plant has a quarry and license for kaolin mining, production can be provided by qualified staff.
Proposal (project) readiness stage - a proposal

Contact information – Address: Lenina Str., 55, Baranivka, Zhitomir region,
enterprise co-owner: Konstantin Svyatogorov, phone: 0974776762, e-mail: [email protected]

 

 

Project - building of a glass factory.
Initiator - Bilokrynyts'ka village council.
Total cost of proposal (project) - should be calculated by the investor
Investments required - should be calculated by the investor
Predicted payback period - depending on the project cost
The essence of investment proposal (project) -
building of a glass factory
Source of proposal (project) - Land plot area – 4,2 hectares. Along with the land there is a quarry with reserves of high-quality sand with a capacity over 400 thousand tons. In the village are available highly qualified workers for the enterprise.
Proposal (project) readiness stage - project proposal.
Contact information – Zhytomyr region, Radomyshl's'kyi district, urban village Bila Krynytsya, Bilokrynyts'kyi village head Ihor Henyuta, phone: (04132) 7-62-81,7-62-41.

 

 

Project – Construction of the enterprise for manufacturing pellets and other wood products 
Initiator –
District Council and State Administration
Total cost of proposal (project), thousand USD 300 thousand USD
Investments required –
300 thousand USD
Predicted p
ayback period (years) – 2 years
The essence of investment proposal (project) – Construction of the enterprise for manufacturing piletiv and other wood products 
Source of proposal (project) –
Land plot – 3,3 hectares available: water, gas, electricity supply
Proposal (project) readiness stage project proposal
Contact information – Zhytomyr region., uv. Chervonoarmiys'k, Lenina st., 123
Contact person - head of District Council Anatoliy Lypko 
Head of Regional State Administration Stanislav Karpins'kyi 
phone (04131) 31447, Tel (04131) 32260.

 

 

Project – Development of the Zherevs’ke deposit of Lugyns’ky district.
Initiator –
LLC "Granitnyi karyer"
Total cost of proposal (project) –
22 million USD
Investments required –
100%
Predicted payback period – 5 years
The essence of investment proposal (project) –
the restoration process of crushed granite on the basis Zherevs’koho granite-porphyry deposits
Source of proposal (project) –
land area of 45,0 hectares, lease term 10 years, a special permit for use of mineral resources for 10 years.
P
roposal (project) readiness stage a business plan.
Contact information –
the management company "DANKO Construction Matiarials", Kiev,  Spas’ka str, 36, tel. (044) 425-8917, e-mail [email protected]

_____________________________________________________________________________

 

Project - upgrading the existing plant and stone quarry on the expansion of existing production units labradorite in advanced technologies of production and cultivation of natural decorative stone
Initiator –
JSC "Korostyshivs’kiy career"
Total cost of proposal (project) -
5 million USD
Investments required -
Total 5 million. USD, including a factory – 2.5 million USD, a quarry - 2.5 million USD
Predicted payback period (years) -
3 years
The essence of investment proposal (project) -
Modernization of existing plant and stone quarry on the expansion of existing production units labradorite in advanced technologies of production and cultivation of natural decorative stone
Source of proposal (project) -
labradorite blocks, slabs and architectural and construction products made of natural decorative stone
Proposal (project) readiness stage -
business plan
Contact information -
12502, Zhytomyr region, Korostyshiv, Chervonyh partisaniv str., 29, head – Vitaliy Voronyi, phone (04130) 5-13-34, E-mail [email protected]

 

 

Project - development of deposits of granite-gneisses and construction of crushed stone plant
Initiator -
Romanivs'ka regional state administration
Total cost of proposal (project) –
5 million USD
Investments required –
5 million USD
Predicted payback period (years) –
3 years
The essence of investment proposal (project) -
creation of a new enterprise for the development a of granite-gneisses deposit and a building of the crushed stone plant.
Source of proposal (project) –
land plot, area – 20 hectares (deposit) Distance to: the road – 3 km., to the railway station – 8 km.
Proposal (project) readiness stage –
business-plan (field development, manufacture crushed stone production capacity of 320 tons. per hour)
Contact information –
13002, uv. Romaniv 50 rokiv Zhovtya str., head of the board of economy of the regional state administration N. Gorbatyuk, phone: (246) 2-17-07, 2-12-98, 2-11-73

 

 

Project - Development of the three plots of Nikits'ke labradorite deposit in order to extract of the block stone

Initiator - LLC "Ruf"

Total cost of proposal (project) - 2 million USD

Investments required - 2 million USD

Predicted payback period (years) - 4 years

The essence of investment proposal (project) - extract a block of stone

Source of proposal (project) - LLC "Ruf" has received special permission to use the subsoil for the purpose of industrial production and land outlets, mining lease, working on 3 projects development areas approved stocks stone block (almost 1 million of cubic meters) of 3 sections of deposits

Proposal (project) readiness stage - project proposal

Contact information - 12114, Volodars’k-Volyns’kyi district, uv. Nova Borova, Pushkins’ka str., 159/24, Head O. Verbovchuk, mob. phone: 067-261-23-76.

 

 

Project – building a quarry and production of natural stone block
Initiator –
LLC "Progress”
Total cost of proposal (project) –
1,5 million USD
Investments required –
750 thousand USD
Predicted payback period (years) –
3 years
The essence of investment proposal (project) – Construction quarry and mining natural stone block

Source of proposal (project) – field is located on reserve lands Horbulivs’ka village council. Quarry area – 5,13 hectares. Approved amounts of reserve labradorite – 600 thousand cubic meters.
Proposal readiness stage (project) – There is royalty for the duration of 4 years; leasing contract for the land plot.

Contact information – Zhytomyr region, Chernyakhivs’kyi district, village Horbuliv, 12316, phone: (067) 4126359, director of the LLC "Progress" M. Sahnevuch

_____________________________________________________________________________

Project - installation of technological equipment for production crushed stone for construction and concrete work
Initiator – LLC "Kutyschans’kyi granitnyi caryer"

Total cost of proposal (project) – 1062,5 thousand USD
Investments required -
1062,5 thousand USD
Predicted payback period (years) - 7 years

The essence of investment proposal (project) - Offers construction of production facilities and installation of manufacturing equipment for production crushed stone
Source of proposal (project)
 – land plot area – 25.0 hectares, 1,350 kW power supply, roads with a firm covering, 17 km to the railway station
Proposal (project) readiness stage
design and budget documentation
Contact information –
Zhytomyr region, Lyubars’kyi district village Lypno, Radyans’ka Str. 20, Director of LLC "Kutyschans’kyi granitnyi caryer" Yuriy Boyko, mob. phone: 0962992272

 

 

Project - Rehabilitation and resettlement of existing premises in shop for natural stone processing capacity of 2000 square meters of finished products per month

Initiator - JSC "Kinotur"

Total cost of proposal (project) - 900 thousand USD

Investments required - USD 500 thousand USD

Predicted payback period - 5 years

The essence of investment proposal (project) - reconstruction and equipping of existing buildings under the plant for processing natural stone capacity of 2000 square meters of finished products per month

Source of proposal (project) - the territory of 4 hectares with production, administrative, storage, utility rooms, current transformer substation, asphalted access road

Proposal (project) readiness stage - project proposal

Contact information - 10008, Zhitomir, Teatral’na str., 19,  ap. 2, Director – O. Spirin,  Mob. phone: 050-463-31-28, e-mail: [email protected]

_____________________________________________________________________________

Project - Construction Mining and Metallurgical Combine on titanium-apatite deposit of Volodars’k-Volyns’kiy district

Initiator - PPE “SIRIUS”

Total cost of proposal (project) - 2.2 billion USD (the first stage – 230-250 million)

Predicted payback period - 3 years

The essence of investment offer (project) – The creation of mining and metallurgical plant that will specialize in the development of deposits of titanium-apatite ores and produce 11 kinds of products from them, totaling about 12 billion dollars a year in Volodars’k-Volyns’kyi district of Zhytomyr region

Source of supply (project) - Availability of the land plot, licenses, personnel, communications and transport links

Proposal (project) readiness stage - Design and estimate documentation

Contact information – Director – Mykola Shcherbyna

phone: (044)4846402

 

 

ENERGY

 

Project – Construction of small hydropower plants on the river Sluch in the district (Nesolon’, Hul’s’k, Kurchyts’ka Huta, Natalivka, Oleksandrivka villages)
Initiator – Novohrad-Volyns’ka district state administration
Total cost of proposal (project) – 2 million USD
Investments required – 2 million USD
Predicted payback period -
The essence of investment proposal (project) – construction of small hydropower plants on the river Sluch, electricity production.

Source of proposal (project) – availability of land, natural possibilities of the river for the creation of small hydroelectric power plants.
Proposal (project) readiness stage - project proposal
Contact information – 11700, Novograd-Volyns’kyi Shevchenko str., 16, deputy head of the district state administration S. Ostapenko, phone: (04141) 52-125, mob. phone: 067 -460-09-26, e-mail: [email protected]

 

 

HOUSING

 

Project – The project of modernization of water supply, wastewater and wastewater treatment of Berdychiv
Initiator - INC "Berdychivvodokanal"
Total cost of proposal (project) - 68 230 thousand USD
Investments required - 68 230 thousand USD
Predicted payback period - 15 years
The essence of investment proposal (project) – to ensure the city's population with quality drinking water and a modern sewerage system, a decline in energy and material resources in terms of reforming housing through rehabilitation and development of centralized water supply, sewerage and sewage treatment with the introduction of cogeneration plants, construction of biogas complex waste water treatment facilities.

Source of proposal (project) – access to land, personnel, transportation connections.
Proposal (project) readiness stage – Project and estimates (partially)
Contact information – 13300, Berdychiv, Zhovtneva Square, 1, Deputy Mayor S. Onofriychuk, phone: (04143) 4-28-01.

 

­­­­­­­­­­­­­­­­­­­­­­­­

Project - Cleaning and increase of volume of the reservoir "Vidsichne" and reconstruction of water supply of the raw water in Zhytomyr.

Initiator - CE "Zhytomyrvodokanal"
Total cost of proposal (project)
– 15,4 million USD
Investments required – 15,4 million USD
Predicted payback period -
The essence of investment
proposal (project) – clearance and increase the volume of the reservoir "Vidsichne" and reconstruction of water supply raw water Zhytomyr.

Source of proposal (project)  -
Proposal (project) readiness stage
– feasibility
Contact information –
10005, Zhitomir, Chernyahivs’kogo str., 120, director A. Bilobrov, phone: (0412) 24-45-40, 24-19-90

 

 

Project - Upgrading of sewage treatment facilities with a demonstration of their capacity to 20.0 thousand cubic meters per day in Korosten’ replacement of emergency and technically worn out equipment with energy efficient technologies.
Initiator - Korosten’ utility company "Vodokanal" executive committee Korosten’ City Council
Total cost of proposal (project) - 11,5 million USD
Investments required - 11,5 million USD
Predicted payback period - from 8 to 10 years
The essence of investment proposal (project) – the closure of old treatment plant, "reduction of environmental load of the river Uzh, modernization of equipment, use of energy saving technologies, introduction of advanced wastewater treatment system.

Source of proposal (project) – land plot with area – 9,22 hectares, equipment, power supply, licensing, personnel, communications, transportation.

Proposal (project) readiness stage – a business plan and feasibility study
Contact information – Korosten’, Grushevs’kogo str., 67, head O. Chirkin phone/fax (041-42) 4-21-42, chief engineer I. Mazuryk phone/fax (04142) 4-90-10 e-mail:  HYPERLINK "mailto:[email protected]" [email protected]; Korosten’, Grushevs’kogo str., 22, Deputy Mayor for Housing L. Jakubowski phone/fax (04142) 4-23-38, 9-63-68

 

Project – Reconstruction of sewage facilities
Initiator – HE "Dobrochyn plus"
Total cost of proposal (project) – 1 million USD
Investments required – 1 million USD
Predicted payback period – 5 years
The essence of investment proposal (project) – reconstruction of treatment facilities, uninterrupted water supply village Fedorivka population.

Source of proposal (project) – All necessary communications networks, equipment, personnel, transportation, capacity of existing treatment facilities - 280 cubic meters of water per day.
Proposal (project) readiness stage – project proposal
Contact information – 11600, Malyns’kyi district, village Fedorivka, the village head O. Samila, phone: (04133) 6-92-75.

 

 

Project – The introduction of new technologies – install heat pump instead of boiler number 1 School  Karla Liebknechta str., 46/26.
Initiator -  Municipal enterprise "Teplozabezpechennya (Heating)"
Total cost of proposal (project) – 612.5 thousand USD
Investments required – 612.5 thousand USD
Predicted payback period – 17 years
The essence of investment proposal (project) – due to energy use of outdoor air are expected to significantly reduce energy costs and the cost of produced heat, complete cessation of pollution, replacement of wooden windows with energy efficient metal coating, curtain wall insulation, loft buildings, installation of the meter heat SVTU-10M-2 with weather control.

Source of proposal (project) – Land and industrial area.

Proposal (project) readiness stage – Project and estimates
Contact information – Korosten’, Kirova str., 8A, head of the enterprise T. Baranovs’ka  phone: (04142) 4-32-27, fax 9-61-63, e-mail: [email protected]

 

 

Project - Building intake structures with water supply network road to the village Hranitne.
Initiator - Municipal enterprise "Hranitnens’ke"
Total cost of proposal (project)
– 301 thousand USD

Investments required – 223 thousand USD
Predicted payback period – 5 years
The essence of investment proposal (project) – Construction of intake structures on road conduit in Hranitne based on public-private partnership. Ensure uninterrupted water supply of population, sanitary and epidemiological welfare of urban village Hranitne.

Source of proposal (project) – land, personnel, industrial areas, power supply, communications, transportation.

Proposal (project) readiness stage – Project and estimates 
Contact information – 11634, Malyns’kyi district, village Hranitne, the Mayor M. Kyrsa phone/fax: (04133) 92-3-80.

 

 

Project – Reconstruction of street lighting in the city of Berdychiv
Initiator - City municipal rescue service
Total cost of proposal (project) - 300 thousand USD
Investments required – 300 thousand USD
Predicted payback period – 4 years
The essence of investment proposal (project) – ensure the quality of our city lighting, increasing living standards, increase the level of road safety and significantly reduce power consumption.

Source of proposal (project) – personnel, equipment, communications, transportation.
Proposal (project) readiness stage – Proposal, part design and budget documentation
Contact information – 13300, Berdychiv, October Square, 1, Deputy Mayor S. Onofriychuk phone: (04143) 4-28-01.

 

 

Project - Establishment and implementation of the sorting, collection, removal and recycling of solid waste in Ovruch
Initiator – Ovruchs’ka City Council
Total cost of proposal (project) – 300 thousand USD
Investments required – 300 thousand USD
Predicted payback period - 5 years
The essence of investment proposal (project) – the elimination of unauthorized dumps through equipment for waste collection for businesses and private sector to install additional boxes, containers for sorting waste in the city building department for processing solid waste.

Source of proposal (project) - plot of land transport.

Proposal (project) readiness stage - a business plan, feasibility study 
Contact information - Ovruch, Radyans’ka str., 46, Mayor V. Schwab, phone: (04148) 4-47-48. 

 

Project – Technical upgrading boiler on the Karl Marx str., 61a in Korosten’

Initiator – CE "Teplozadezpechennya"

Total cost of proposal (project) – 187,4 thousand USD

Investments required – 187,4 thousand USD

Predicted payback period – 3 years 9 months

The essence of investment proposal (project) - technical re-boiler on Karl Marx street, the 61st, establishing two new modern boilers Riello RTQ-2000 with the burners Riello RS 250 network pump Vogel LMN80160U1VN1852, chemical water treatment of DFU-1354GL with automatic regeneration, make up pumps Lowara 5SV09F15T with frequency speed regulation of electric motors, two volume compensators 1000 liters, pumps, boilers Wilo Top-S 65/10 -2 units, two heatutilisators 50 kW each.

Source of proposal (project) – land, industrial area.

Proposal (project) readiness stage – Project and estimates

Contact information – Korosten’ st. Kirov, 8A, head T. Baranovs’ka phone: (04142) 4-32-27, fax 9-61-63, e-mail: [email protected]

 

 

Project – Reconstruction of the deironing station at the second lift pumping station number 1 in Ovruch (first)

Initiator – CE "Komunal’nyk"

Total cost of proposal (project) – 80 thousand USD

Investments required – 80 thousand USD

Predicted payback period – 2 years

The essence of investment proposal (project) – re-equipment of a pumping station second lift 1 at a new energy-efficient pumping station, with the implementation of which would be achieved by saving electricity and the provision the population in Ovruch of drinking water on a twenty-four hour.

Source of proposal (project) – land plot, transport connection.

Proposal (project) readiness stage – a working draft, which is on expertise.

Contact information – Ovruch, Franko str.,5a, head A. Rudnits’kyi, phone: (04148) 4-47-93, 2-21-48.

 

 

Project - Reconstruction deironing station at the second lift pumping station number 2 in Ovruch (first)

Initiator – KP "Komunal’nyk"

Total cost of proposal (project) – 80 thousand USD

Investments required – 80 thousand USD

Predicted payback period – 2,5 years

The essence of investment proposal (project) – re-equipment of a pumping station second lift 2 at a new energy-efficient pumping station, with the implementation of which would be achieved by saving electricity and the provision the population in Ovruch of drinking water on a twenty-four hour.

Source of proposal (project) – plot of land transport.

Proposal (project) readiness stage – a working draft, which is on expertise.

Contact information – Ovruch, Franko str., 5a, head A. Rudnyts’ky, phone: (04148) 4-47-93, 2-21-48.

 

Project - Replacement the electric pump units and starting equipment for step-up stations III and IV of Korosten’ CE "Vodokanal" using energy saving and resource conservation technologies.

Initiator - CE "Vodokanal" executive committee Korosten’ City Council

Total cost of proposal (project) - 75 thousand USD

Investments required - 75 thousand USD

Predicted payback period - from 1,5 to 2,5 years

The essence of investment proposal (project) - implementation of environmental action plan that will reduce the acute social tension that has developed due to the threat of sanitary-epidemiological and ecological safety of city residents through an imperfect system of distribution and transportation of potable water.

Source of proposal (project) - land, equipment, power supply, license and qualified personnel.

Proposal (project) readiness stage - Design (working) documentation

Contact information – Korosten’, Grushevs’kogo str., 67, head of enterprise

A. Chirkin, phone / fax: (041-42) 4-21-42;

Korosten’ str. Grushevskogo, 22, Deputy Mayor for housing and community L. Jakubows’kyi,  phone/fax (04142) 4-23-38, 9-63-68.

_____________________________________________________________________________

 

Project – Introduction of innovate technologies in heat supply systems of Zhytomyr

Initiator – CE “Zhytpmyrteplocomunenergo”

Total cost of proposal (project) – 31,5 million USD

Predicted payback period - 7 years

The essence of investment offer (project) – The project foresees the installation of heat pumps Japanese company Mayekawa using low-potential heat of the river beetle heat output of 8.8 MW, the construction of 4-cogeneration units the company GE Jenbacher total electric capacity of 6 MW and heat output of 6.6 MW. The project would provide an opportunity during the year a hot water and partial heating boiler from consumers on the Zhuyka street, 12, the release capacity boilers for gas-fired and reduced consumption of the natural gas.

Proposal (project) readiness stage - work schedule is designed and agreed with all the participants,

technical economical explanation and assessment of the influence on  the environment are performed, outgoing data is gathered, requests for technical conditions are issued, materials of technical economical substantiation are send to State Building Examination

Contact information – Main board of housing and communal services and energy saving of the Zhytomyr regional state administration. 10014, Zhytomyr, 3/14 square named after S.P. Korolyov, e-mail:  HYPERLINK "mailto:[email protected]" [email protected] Head of the main board – Volodymyr Zbarazhs`kyi tel. (0412) 474704 fax (0412) 474712

 

 

LIGHT INDUSTRY

 

Project - The organization of production of garments
Initiator -
LLC "Noryntsivs’ke"
Total cost of proposal (project) -
1,5 million USD
Investments required -
1,5 million USD
Predicted payback period - 2 years
The essence of investment
proposal (project) –  Organization of production of garments.

Source of proposal (project)  -  premise (condition); electricity, water supply, sewerage, gas connection possible distance to the highway 0.5 km, to the railway line 18 km.
P
roposal (project) readiness stage -  project proposal
Contact information -
Narodyts’kyi district, village Noryntsi, Director Mykolaychuk M. phone: (04140) 9-31-16, mob. phone: 067-589-33-11.

 

 

Project - Creation of production in light industry, electronics on the Vatutina str., 10A
Initiator -
 Executive committee of Berdychiv City Council
Total cost of proposal (project) -
 to the investor’s consideration
Investments required –
100%
Predicted payback period -  

The essence of investment proposal (project) –  establishment of light industry, electronics at the former factory computers.

Source of proposal (project)  -  6-storey building of the former factory computers with the total area – 2448 m2, all necessary communications.
P
roposal (project) readiness stage -  project proposal
Contact information -
13300, Berdychiv, Zhovtneva square, 1, Deputy Mayor T. Pavlishyna phone: (04143) 02.01.63, fax 2-70-79, E-mail: [email protected]

 

 

Mechanical engineering and instrument engineering

 

Project - Creation of production for manufacturing boilers working on wood grains – pellets
Initiator -
Executive comitee of Berdychiv City Council
Total cost of proposal (project) –
125 thousand USD
Investments required –
125 thousand USD

Predicted payback period - 2 years

The essence of investment proposal (project) – creation using a basis of the JSC "Yaruns’ka sil’gosptechnika" production for manufacturing boilers for wood grains – pellets
Source of proposal (project) –
land, industrial premises, equipment, power supply, personnel, transportation.
Proposal (project) readiness stage –
business plan

Contact information - Novohrad-Volyns’kyi region, village Stepove, CEO – A. Bolukh, phone: (04141) 60-728

 

                    

Project – The reconstruction of industrial enterprises

Initiator – Ruzhyns’ka district state administration, head of PE "Evroproba"
Total cost of proposal (project) -
 104 thousand USD (estimated selling price of the company)
Investments required –
to the investor’s consideration

Predicted payback period -  

The essence of investment proposal (project) – reconstruction of industrial enterprises, repairment of agricultural machinery.

Source of proposal (project) -  land plot with area – 6 hectares, the area of administrative and industrial buildings 4012 square meters, the distance to the railway station Chornorudka - 300 m to the district center - 17 km.
Proposal (project) readiness stage –
sale of the enterprise.
Contact information –
Ruzhins’kyi district, village Chornorudka Lenina str., leader P. Lyatoshyns’kyi mob. phone: 050-469-28-35

 

 

Project – The reconstruction of industrial enterprises of JSC "Novohrad-Volyns’ke remontno-transportne pidryyemstvo".

Initiator - The Executive Committee of Novohrad-Volyns’kyi city council
Total cost of proposal (project) -
to the investor’s consideration
Investments required –
 100%

Predicted payback period -

The essence of investment proposal (project) –  reconstruction of industrial enterprises of JSC JSC "Novohrad-Volyns’ke remontno-transportne pidryyemstvo".

Source of proposal (project)  -  area of production and warehouse spaces is five thousand square meters, three-story office building, area of land of 3 hectares (in the lease); centralized water and wastewater, natural gas medium-pressure, transformer substation, transportation accessibility (both passenger and freight).

Propo

Outdated Browser
Для комфортної роботи в Мережі потрібен сучасний браузер. Тут можна знайти останні версії.
Outdated Browser
Цей сайт призначений для комп'ютерів, але
ви можете вільно користуватися ним.
67.15%
людей використовує
цей браузер
Google Chrome
Доступно для
  • Windows
  • Mac OS
  • Linux
9.6%
людей використовує
цей браузер
Mozilla Firefox
Доступно для
  • Windows
  • Mac OS
  • Linux
4.5%
людей використовує
цей браузер
Microsoft Edge
Доступно для
  • Windows
  • Mac OS
3.15%
людей використовує
цей браузер
Доступно для
  • Windows
  • Mac OS
  • Linux